Kim Binh Garment Wastewater reuse system
Project explanation
Raw water is pumped by two power pumps through a static mixing device, where the water is added with PAC chemicals, the water is mixed with PAC chemicals, then polymer chemicals are added and led to the reaction compartment above the tank. settle. Here, the raw water forms flocs, which are then evenly divided to the two bottoms of the settling tank.
The water flow moves from the bottom up through the Lamella settling plate, the flocs are retained and the sludge is periodically discharged by the blowdown valve, the clean water is collected by the serrated collector and flows to the next works.